Seth, Bharat Lal (2010) Lake in transition. Down To Earth, Vol.19 (4). p. 37. ISSN 0971-8079
Full text not available from this repository. (Request a copy)Abstract
The Pushkar lake dried after dredging last summer. The dredging was part of a lake conservation project funded by the Centre and the Rajasthan government. The Rs 48-crore project aims to spruce up the catchment and concretize existing channels that carry the run-off. The latter is to curb losses through evaporation and seepage when water flows from the catchment to the lake through feeder channels after rains. The four-metre-deep dredging was done to accommodate the water that might flow into the lake.
Item Type: | Articles |
---|---|
Keywords: | India, Rajasthan, Lakes, Conservation, Projects, Dredging, Water |
Subjects: | Right to Resources |
Depositing User: | Users 4 not found. |
Date Deposited: | 01 Feb 2022 09:48 |
Last Modified: | 01 Feb 2022 09:48 |
URI: | http://icsfarchives.net/id/eprint/10740 |
Actions (login required)
View Item |